The jackhammering that had caused a serious vibration problem with the servers in the ITOC area had to be stopped. The gerneral contractor solution was with a different type of jack hammer which was more tolerable and minimal vibration in the ITOC. The work has now continued as of Monday May 23rd. A full walkthrough with facilites on what work is still needed to be done in and around the ITOC was done today May 23rd with IT so there is a better understanding of the work to be performed.